S-34.1, r. 1 - Regulation respecting petroleum exploration, production and storage in a body of water

Full text
120. The authorization holder must design and construct the well so as to
(1)  comply with the Industry Recommended Practice, IRP: #25, Primary Cementing, published by the Drilling and Completions Committee;
(2)  ensure work safety;
(3)  prevent incidents in the maximum load conditions normally foreseeable during the life cycle of the well;
(4)  withstand potential conditions, forces and stresses;
(5)  ensure a resistance sufficient for fluid kicks;
(6)  protect the integrity of the groundwater and the body of water;
(7)  ensure that the petroleum zones and the aquifer layers are isolated from one another;
(8)  allow the characterization of the geological formations targeted; and
(9)  allow activities for controlling the pressure of the bottom of the wellbore in a constant and safe manner.
O.C. 1251-2018, s. 120.
In force: 2018-09-20
120. The authorization holder must design and construct the well so as to
(1)  comply with the Industry Recommended Practice, IRP: #25, Primary Cementing, published by the Drilling and Completions Committee;
(2)  ensure work safety;
(3)  prevent incidents in the maximum load conditions normally foreseeable during the life cycle of the well;
(4)  withstand potential conditions, forces and stresses;
(5)  ensure a resistance sufficient for fluid kicks;
(6)  protect the integrity of the groundwater and the body of water;
(7)  ensure that the petroleum zones and the aquifer layers are isolated from one another;
(8)  allow the characterization of the geological formations targeted; and
(9)  allow activities for controlling the pressure of the bottom of the wellbore in a constant and safe manner.
O.C. 1251-2018, s. 120.